Skip to content
PROMOTION! FREE SHIPPING OF ALL BLEACHERS IN CALIFORNIA, NEVADA AND ARIZONA! 3 - 4 Week Lead Time All Products
PROMO! FREE SHIPPING OF ALL BLEACHERS IN CA, NV AND AZ.

3 Row Bleacher PREMIUM + DELUXE - 21' Length

Original price $3,399.00 - Original price $3,399.00
Original price
$3,399.00
$3,399.00 - $3,399.00
Current price $3,399.00

3 Rows Non-Elevated Bleacher Deluxe premium x 21' comes with anodized 2''x10'' aluminum seat boards and (double) 2''x10'' mill finish footboard and all with aluminum endcaps. Bleacher does come with backrest on the last row only. The bleacher understructure is fabricated with 2''x2'' 6061 T-6 Aluminum. This bleacher does not include riser boards. This bleacher does not have any aisles. This bleacher is not ADA compliant. We are able to powder coat the seats of the bleacher for design purposes. All bleachers come standard with anodized seat planks. If you are interested in adding color, please request a quote.

All Bleachers are made with great pride by California Bleachers, and are satisfaction guaranteed

All photos are products of California Bleachers; all rights reserved. Please note that photo may depict a different dimension bleacher. Please note the dimensions on title of product.

Request a quote
Nationwide Shipping
Turn Key Service
Satisfaction Guaranteed
5 Star Rating

More Details

Length Seats Guardrail Dbl. Footboard Riser Boards Mid-aisles
9' 18 No No No No
15' 30 No No No No
21' 42 No No No No
24' 48 No No No No

Specs

Specs

  • All Aluminum Angle Frames / 6061-T6
  • All Galvanized hardware
  • (1) 2''x10'' Foot Boards / 6063 Aluminum
  • 2"x10" Anodized Seat Boards / 6063 Aluminum
  • Drawing for Assembly available
  • All Bleachers Compliant to California Building Code

Get in Touch To Get A Quote Today

FAQ

Category

How long does manufacturing take?

It takes about 1-2 weeks for the manufacturing process

How long does shipping take?

Shipping goes by weight, so it depends on product or variation, and shipping zone. Products shall be shipping in 2 weeks.

How long does installation take?

Time depends on the product, a 3 row x 21' can take 30minutes to an hours. a 10 Row Bleacher could take a couple days by an expert team with all tools needed.